N59826 accident

NTSB ANC25LA016 · 2025-01-10 · Fairbanks, AK · near FAI

Docket — crew, injuries and powerplant

Factual narrative

The pilot reported that, while taxiing through an automated airport taxiway gate, the gate closed on the airplane which resulted in substantial damage to the right aileron. An airport surveillance video showed the airport taxiway gate closing, with warning lights that indicated a moving gate illuminated, and the accident airplane continuing to taxi towards the closing gate. The accident airplane then impacts the closing gate with its right wingtip and left wing leading edge. The pilot reported that there were no preaccident mechanical failures or malfunctions with the airplane that would have precluded normal operation.

Probable cause

The pilot’s failure to recognize that an automated taxiway gate was closing, and the pilot’s failure stop for the closing gate. The National Transportation Safety Board determined the probable cause of this accident.

Circumstances

Event type
Accident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
BKN
Ceiling (ft)
22000
Visibility (sm)
10
Wind direction
350
Wind speed (kt)
5
Temperature (F)
14
Nearest airport
Fairbanks International Airpor
Distance from field
0.0
Airport elevation
439

Aircraft

RegistrationMakeModelDamageFAR part
N59826 — — SUBS 135

Sequence of events

#OccurrencePhase
1 Taxi Ground collision defining Taxi

Findings

Finding
Personnel issues-Action/decision-Info processing/decision-Identification/recognition-Pilot cause
Personnel issues-Action/decision-Info processing/decision-Decision making/judgment-Pilot cause
Environmental issues-Physical environment-Object/animal/substance-Fence/fence post-Contributed to outcome cause
Environmental issues-Operating environment-Airport facilities/design-(general)-Contributed to outcome cause
Organizational issues-Management-Policy/procedure-Availability of policy/proc-Airport factor
Organizational issues-Management-Policy/procedure-Availability of policy/proc-Operator factor