N20752 Cessna 185 accident

NTSB ANC93LA016 · 1992-11-28 · POINT HOPE, AK

Docket — crew, injuries and powerplant

Factual narrative

THE ENGINE FAILED ABOUT 5 TO 6 MINUTES AFTER TAKEOFF DURING THE CLIMB TO CRUISE PHASE OF OPERATION. THE PILOT MADE AN OFF AIRPORT FORCED LANDING ON AN ICE FLOW. AT THE TIME OF THE ACCIDENT, THE PART 135 OPERATOR WAS REPOSITIONING THE AIRPLANE UNDER PART 91. THE CAUSE OF THE ENGINE FAILURE WAS TRACED TO A SPUN CRANKSHAFT BEARING WHICH BLOCKED OFF THE OIL HOLE TO THE NO. 2 CYLINDER CONNECTING ROD, RESULTING IN ITS CATASTROPHIC FAILURE. THE SPUN BEARING MOST LIKELY WAS THE RESULT OF EITHER A LOSS OF TORQUE OR INSUFFICIENT TORQUE BEING APPLIED TO THE CRANKCASE THRU STUD BOLTS.

Probable cause

THE FAILURE OF THE NO. TWO CYLINDER CONNECTING ROD DUE TO A SLIPPED (SPUN) MAIN CRANKSHAFT BEARING WHICH BLOCKED OFF THE OIL HOLE TO THE CONNECTING ROD. A FACTOR IN THE ACCIDENT WAS THE UNSUITABLE TERRAIN ON WHICH TO PERFORM A FORCED LANDING. The National Transportation Safety Board determined the probable cause of this accident.

Circumstances

Event type
Accident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
10
Wind direction
45
Wind speed (kt)
15
Temperature (F)
9
Distance from field
0.0

Aircraft

RegistrationMakeModelDamageFAR part
N20752 CESSNA 185 SUBS 091

Sequence of events

#OccurrencePhase
1 351 Cruise
2 180 Cruise
3 191 Cruise
4 290 Cruise

Findings

Finding
14001 cause
15213 cause
17002 cause
14006 cause
19200 factor