N5796V Beech A23-19 accident

NTSB ATL89LA205 · 1989-08-31 · HERTFORD, NC

Docket — crew, injuries and powerplant

Factual narrative

THE PILOT REPORTED THAT THE AIRPLANE INITIALLY TOUCHED DOWN ON THE NOSE GEAR, WHICH OVERLOADED IT AND CAUSED IT TO COLLAPSE. THE AIRPLANE SWERVED COLLAPSING THE MAIN GEAR. THE PILOT NOTED THAT THE RWY AT THE PVT STRIP WAS 2,000 FT LONG WITH POWER LINES AT EACH END; HE WAS ATTEMPTING TO LAND IMMEDIATELY AFTER CLEARING THE WIRES AT THE APPROACH END, SO THAT HE WOULD HAVE MORE RWY FOR ROLL-OUT AND AVOID OVERRUNNING THE RWY END.

Probable cause

PILOT'S FAILURE TO PROPERLY FLARE THE AIRPLANE DURING LANDING. FACTORS CONTRIBUTING TO THE ACCIDENT WERE THE HIGH OBSTRUCTIONS AT BOTH ENDS OF THE RUNWAY. The National Transportation Safety Board determined the probable cause of this accident.

Circumstances

Event type
Accident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
7
Wind direction
350
Wind speed (kt)
8
Temperature (F)
73
Nearest airport
HERTFORD
Distance from field
0.0
Airport elevation
15

Aircraft

RegistrationMakeModelDamageFAR part
N5796V BEECH A23-19 SUBS 091

Sequence of events

#OccurrencePhase
1 192 Cruise
2 260 Cruise
3 191 Cruise

Findings

Finding
19200 factor
10405
24534 cause
24537
10401