N1936Y Mooney M-20E accident

NTSB ATL88IA074 · 1987-10-06 · COLUMBIA, SC · near CAE

Docket — crew, injuries and powerplant

Factual narrative

DURING TAKEOFF THE PROPELLER STUDS FAILED AND THE PROPELLER DEPARTED THE ACFT. FAA INCIDENT RPT STATED THAT PROPELLER HAD BEEN OVERHAULED AND REPLACED 32 HOURS PRIOR TO THE SEPARATION. METALLURGICAL EXAM OF THE PROPELLER STUDS REVEALED FATIGUE FAILURE OF THE STUDS THROUGH THE THREADED AREA WITH NO DAMAGE TO THE THREADS. FATIGUE FAILURE OF PROP STUDS OCCURRED AS A RESULT OF VIBRATION DUE TO INADEQUATE TORQUING OF THE MOUNTING NUTS.

Circumstances

Event type
Incident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
15
Wind direction
190
Wind speed (kt)
3
Temperature (F)
61
Nearest airport
COLUMBIA METRO
Distance from field
0.0
Airport elevation
236

Aircraft

RegistrationMakeModelDamageFAR part
N1936Y MOONEY M-20E MINR 091

Sequence of events

#OccurrencePhase
1 130 Cruise

Findings

Finding
14500 cause
24111 cause