N1936Y Mooney M-20E accident
NTSB ATL88IA074 · 1987-10-06 · COLUMBIA, SC · near CAE
Docket — crew, injuries and powerplant
Factual narrative
DURING TAKEOFF THE PROPELLER STUDS FAILED AND THE PROPELLER DEPARTED THE ACFT. FAA INCIDENT RPT STATED THAT PROPELLER HAD BEEN OVERHAULED AND REPLACED 32 HOURS PRIOR TO THE SEPARATION. METALLURGICAL EXAM OF THE PROPELLER STUDS REVEALED FATIGUE FAILURE OF THE STUDS THROUGH THE THREADED AREA WITH NO DAMAGE TO THE THREADS. FATIGUE FAILURE OF PROP STUDS OCCURRED AS A RESULT OF VIBRATION DUE TO INADEQUATE TORQUING OF THE MOUNTING NUTS.
Circumstances
- Event type
- Incident
- Highest injury
- None
- Weather conditions
- Visual Meteorological Cond
- Light condition
- Day
- Sky condition
- NONE
- Ceiling (ft)
- 0
- Visibility (sm)
- 15
- Wind direction
- 190
- Wind speed (kt)
- 3
- Temperature (F)
- 61
- Nearest airport
- COLUMBIA METRO
- Distance from field
- 0.0
- Airport elevation
- 236
Aircraft
| Registration | Make | Model | Damage | FAR part |
|---|---|---|---|---|
| N1936Y | MOONEY | M-20E | MINR | 091 |
Sequence of events
| # | Occurrence | Phase |
|---|---|---|
| 1 | 130 | Cruise |
Findings
| Finding | |
|---|---|
| 14500 | cause |
| 24111 | cause |