Factual narrative

THE ACFT WAS LANDED GEAR-UP IN A FLD FOLLOWING A LOSS OF PWR DURING AN INITIAL TAKEOFF CLIMB. PURPOSE OF THE FLT WAS TO CHECK THE ENG AS IT HAD BEEN DISASSEMBLED BECAUSE OF METAL CONTAMINATION FROM THE CENTER MAIN BEARING. POST ACCIDENT INSPECTION OF THE ENG DISCLOSED THE #1, #2 AND #4 CYLINDER SPARK PLUG ELECTRODES WERE PEENED WITH BROKEN OUT SECTIONS AND CERAMIC POSTS. THE RESPECTIVE CYLINDER BARRELS AND PISTON HEADS WERE FOUND BADLY MARKED. THE #3 PISTON HEAD WAS SLIGHTLY MARKED AND PEENING WAS BISIBLE ON THE VALVE HEADS. INTAKE AND EXHAUST PIPES SHOWED SCRAPE MARKS WHEN REMOVED. A 1/8 INCH PIECE OF ALUMINUM PIPE WAS FOUND INSIDE THE #4 INTAKE PIPE.

Circumstances

Event type
Accident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
15
Wind direction
270
Wind speed (kt)
10
Temperature (F)
63
Distance from field
0.0
Airport elevation
0

Aircraft

RegistrationMakeModelDamageFAR part
N1339J Rockwell 112A SUBS 091

Sequence of events

#OccurrencePhase
1 350 Cruise
2 180 Cruise
3 320 Cruise

Findings

Finding
14000 cause
24116 cause
19200
19200
22002