N956VJ Mcdonnell Douglas DC-9-30 accident

NTSB ATL84IA246 · 1984-08-06 · NASHVILLE, TN

Docket — crew, injuries and powerplant

Factual narrative

DURING THE CLIMB-OUT, A 15% DECREASE IN THE RIGHT ENG EPR WAS NOTED BY THE FLT CREW. THIS WAS FOLLOWED BY A LOUD BANG & FAILURE OF THE #2 ENG. THE #2 ENG WAS SHUT DOWN & THE ACFT WAS FLOWN BACK TO THE DEPARTURE ARPT. AN INITIAL EXAM REVEALED THAT THE RIGHT ENG TOP COWLING HAD SEPARATED & THE LOWER SECTION OF THE COMBUSTION CASE WAS SPLIT. ENG REMOVAL & TEARDOWN REVEALED THE #5 FUEL NOZZLE NUT LOCK RING WAS MIS-ASSEMBLED. THIS DETRACTED FROM THE TORQUE ON THE FUEL NOZZLE NUT & INADEQUATELY COMPRESSED THE #5 FUEL NOZZLE SEAL. SUBSEQUENTLY, THE FUEL NOZZLE LEAKED & ALLOWED LOCAL OVERTEMP OF THE OUTER COMBUSTION CHAMBER CASE AT THE 6 O'CLOCK POSITION.

Circumstances

Event type
Incident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
10
Wind direction
240
Wind speed (kt)
8
Temperature (F)
82
Distance from field
0.0
Airport elevation
0

Aircraft

RegistrationMakeModelDamageFAR part
N956VJ MCDONNELL DOUGLAS DC-9-30 MINR 121

Sequence of events

#OccurrencePhase
1 352 Cruise

Findings

Finding
15118 cause
14200 cause
14201 cause
10200
24111 cause