N4709Y Piper PA-25-235 accident

NTSB LAX83LA213 · 1983-05-04 · HEALDSBURG, CA

Docket — crew, injuries and powerplant

Factual narrative

BEFORE STARTING HIS DUSTING OPERATION, THE PLT HAD OBSERVED THE GRAPE VINEYARD & MADE PLANS TO BEGIN ON THE FOLLOWING DAY. HE REPORTED OBSERVING THE POWER LINES THAT WERE SUSPENDED ACROSS THE VINEYARD. HOWEVER, HE DID NOT NOTICE THE ANCHOR WIRE THAT WAS LOCATED BENEATH THE POWER LINES. THE WIRE EXTENDED APRX 600 FT FROM A TOWER ON A HILL TO A POLE IN THE VINEYARD. DURING A SWATH RUN UNDER THE POWER LINES, THE ACFT STRUCK THE ANCHOR WIRE, THEN CRASHED & BURNED. THE PLT BELIEVED THAT THE FIRE BEGAN WHEN SULFER DUST SPILLED ONTO THE ENGINE EXHAUST MANIFOLD.

Circumstances

Event type
Accident
Highest injury
None
Weather conditions
Visual Meteorological Cond
Light condition
Day
Sky condition
NONE
Ceiling (ft)
0
Visibility (sm)
15
Wind direction
0
Distance from field
0.0

Aircraft

RegistrationMakeModelDamageFAR part
N4709Y PIPER PA-25-235 DEST 137

Sequence of events

#OccurrencePhase
1 220 Cruise
2 230 Cruise

Findings

Finding
20200 factor
24001 cause
24021 cause