N62481 Piper PA-23-250 accident

NTSB NYC82FA029 · 1982-02-03 · NEWBURGH, NY · near SWF

Docket — crew, injuries and powerplant

Factual narrative

AT 2234 THE PLT WAS ISSUED A VECTOR TO THE INITIAL APPROACH FIX FOR THE ILS RWY 9 APCH. HE WAS ALSO ISSUED THE FOLLOWINGWX "...STEWART WEATHER THIRTY MINUTES AGO IS ESTIMATED ONE THOUSAND OVERCAST SIX MILES IN LIGHT RAIN AND HAZE." AT 2238 THE PLT WAS ADVISED TO EXPECT A 25-30 MINUTE DELAY & WAS CLEARED TO HOLD. AT 2306 THE PLT OF A B-727 LANDING ON RWY 9 REPORTED BREAKING OUT AT 400 FT. AT 2308 THE PLT WAS CLEARED FOR THE APPROACH & RESPONDED AFFIRMATIVE WHEN ASKED IF HE HAD CURRENT WX INFORMATION. THE ACFT CRASHED APPROXIMATELY 5,000 FT FROM THE APPROACH END & AN ESTIMATED 1,500 FT RIGHT OF THE EXTENDED CENTERLINE OF RWY 9. ON 7/2/81 THE PLT FAILED HIS INITIAL ATP FLT EXAM DUE TO UNSATISFACTORY ILS APPROACHES. ON 1/21/82 DURING A 135 CHECK THE PLT'S ILS APPROACH WAS "VERY UNSATISFACTORY" & AS A CONSEQUENCE THE PLT WAS DISAPPROVED FOR OPERATION UNDER IFR.

Circumstances

Event type
Accident
Highest injury
Fatal
Weather conditions
Instrument Meteorological Cond
Light condition
Night/Dark
Sky condition
OVC
Ceiling (ft)
400
Visibility (sm)
4
Wind direction
60
Wind speed (kt)
6
Temperature (F)
88
Nearest airport
STEWART
Distance from field
0.0
Airport elevation
0

Aircraft

RegistrationMakeModelDamageFAR part
N62481 PIPER PA-23-250 DEST 135

Sequence of events

#OccurrencePhase
1 230 Cruise

Findings

Finding
20100 factor
20000 factor
20000 factor
20000 factor
24015 factor
24024 cause
24522 cause
31160 factor
34200 factor