Airports

PABR WILEY POST-WILL ROGERS MEML

Utqiagvik, AK · FAA identifier BRW · Accident history (NTSB)

Elevation
49 ft
Tower
Uncontrolled
Use
Public
Position
71°17′05.5″N
156°46′06.9″W
Loading the 3D view…
LOOK
MOVE
Airport geometry © OpenStreetMap contributors (ODbL); runways and lighting from FAA NASR.

Conditions

METAR 10 minutes ago
SPECI PABR 192201Z AUTO 09012KT 1 1/2SM BR OVC003 M03/M04 A2948 RMK AO2 T10281039 TSNO $
     Category: LIFR
         Wind: 090° at 12 kt
   Visibility: 1.5 sm
Temp/Dewpoint: -3°C / -4°C
    Altimeter: 29.48" Hg
          Sky: 300 ft - OVC
TAF 4h 51m ago
Prevailing 1918Z-2018Z NOW
PABR 191720Z 1918/2018 09017G24KT 6SM BR OVC006
     Category: IFR
         Wind: 090° at 17 kt gust 24 kt
   Visibility: 6 sm
      Weather: PABR 191720Z BR
          Sky: 600 ft - OVC
FM 192200Z NOW
FM192200 09010KT 6SM BR OVC006
     Category: IFR
         Wind: 090° at 10 kt
   Visibility: 6 sm
      Weather: BR
          Sky: 600 ft - OVC

Runways

08/26 7,100 x 150 - ASPH-F
08 right traffic
12 kt head
26
12 kt tail
0826N ↑

Frequencies

CTAF 123.600
ASOS 132.150
All frequencies (8)
UseFrequencySectorHours
CTAF 123.600
ASOS 132.150
ANCHORAGE CENTER 135.3
ANCHORAGE CENTER 239.25
FAI RCO 121.5
FAI RCO 122.2
FAI RCO 122.6
FAI RCO 123.6

Procedures and charts

Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.

NOTAMs

Not for operational use

NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.

PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.

RUNWAYS (3)
RWY 08 FICON 4/4/4 70 PCT FROST OBS AT 2611191700.
EFF 191802Z - 201700Z
EXP IN 18h 48m
Runway 08 FICON 4/4/4 70 PCT FROST OBS AT 2611191700.
RWY 26 ALS U/S
EFF 030029Z - 271500Z
EXP IN 37d 16h
Runway 26 approach lighting system unserviceable
RWY 26 PAPI U/S
EFF 192030Z - 192230Z
EXP IN 18m
Runway 26 PAPI unserviceable
TAXIWAYS (1)
TWY A, C FICON FROST OBS AT 2611191700.
EFF 191802Z - 201700Z
EXP IN 18h 48m
Taxiway A, C FICON FROST OBS AT 2611191700.
APRON (1)
APRON ALL FICON COMPACTED SN OBS AT 2611191700.
EFF 191803Z - 201700Z
EXP IN 18h 48m
Apron ALL FICON COMPACTED snow OBS AT 2611191700.
AIRPORT & SERVICES (2)
SVC BARROW FSS CLSD LOCAL AP ADVISORY SER NOT AVBL
EFF 021500Z - 310700Z
EXP IN 72d 08h
Service BARROW FSS CLOSED LOCAL airport ADVISORY SER NOT available
SVC AFIS NOT AVBL DLY
EFF 021500Z - 010700Z
EXP IN 73d 08h
Service AFIS NOT available daily
NAV & PROCEDURES (9)
BRW NAV ILS RWY 08 LOC/DME U/S
EFF 262044Z - 271500Z
EXP IN 37d 16h
BRW navigation ILS Runway 08 LOC/DME unserviceable
COM REMOTE COM OUTLET 121.5, 122.2 U/S
EFF 170011Z - 272000Z
EXP IN 37d 21h
Communications REMOTE communications OUTLET 121.5, 122.2 unserviceable
COM REMOTE COM OUTLET 122.6 U/S
EFF 300544Z - 301500Z
EXP IN 71d 16h
Communications REMOTE communications OUTLET 122.6 unserviceable
COM REMOTE COM OUTLET 122.6 U/S
EFF 300544Z - 302000Z
EXP IN 71d 21h
Communications REMOTE communications OUTLET 122.6 unserviceable
COM REMOTE COM OUTLET 123.6 U/S
EFF 080815Z - 241500Z
EXP IN 65d 16h
Communications REMOTE communications OUTLET 123.6 unserviceable
COM REMOTE COM OUTLET 123.6 U/S
EFF 080815Z - 242000Z
EXP IN 65d 21h
Communications REMOTE communications OUTLET 123.6 unserviceable
IAP WILEY POST-WILL ROGERS MEML, UTQIAGVIK, AK. ILS OR LOC RWY 8, AMDT 3... LOC BC RWY 26, AMDT 3... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, BRW VOR/DME OUT OF SERVICE. 2611172120-2611202359EST
EFF 172120Z - 210459Z
EXP IN 1d 06h
Instrument approach procedure WILEY POST-WILL ROGERS MEML, UTQIAGVIK, AK. ILS OR localizer Runway 8, amendment 3... localizer BC Runway 26, amendment 3... PROCEDURE not authorized except FOR aircraft EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, BRW VOR/DME OUT OF SERVICE. effective 17 Nov 2026 2120Z until 20 Nov 2026 2359Z (estimated)
IAP WILEY POST-WILL ROGERS MEML, UTQIAGVIK, AK. ILS OR LOC RWY 8, AMDT 3... LOC BC RWY 26, AMDT 3... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, BRW VOR/DME OUT OF SERVICE.
EFF 172120Z - 202359Z
EXP IN 1d 01h
Instrument approach procedure WILEY POST-WILL ROGERS MEML, UTQIAGVIK, AK. ILS OR localizer Runway 8, amendment 3... localizer BC Runway 26, amendment 3... PROCEDURE not authorized except FOR aircraft EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, BRW VOR/DME OUT OF SERVICE.
NAV ILS RWY 08 LOC/DME U/S
EFF 262044Z - 272000Z
EXP IN 37d 21h
Navigation ILS Runway 08 LOC/DME unserviceable

Release queue

Awaiting release

No departures are waiting on a release time right now.

Recently released

No recent releases in the current picture.

Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 2211Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Arrivals and departures

Arrivals

No inbound flights in the current picture.

Departures

No outbound flights in the current picture.

Flights seen in the last five minutes, as of 2211Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Statistics

Grants

Awarded FY2010–FY2023
$82.2M
$82,243,689 in 14 grants
AIP share
96%
$79.1M AIP · $3.2M relief
Rank, United States
0.10% of all awards FY2010–FY2025
Rank, AK
2.1% of the state's airport awards
$0$6.3M$12.5M$18.8M$25.0M'10FY2010: $7,200,000'11'12FY2012: $562,500'13'14FY2014: $4,499,866'15'16FY2016: $13,146,509'17'18FY2018: $12,982,558'19FY2019: $24,997,892'20FY2020: $14,964,393FY2020: $14,964,393'21FY2021: $1,015,793'22FY2022: $1,978,143FY2022: $1,978,143'23FY2023: $896,035'24'25
AIP Pandemic relief, ARRA Infrastructure law (AIG, ATRM, FCT)
By fiscal year
FYGrantsAwardedAIPOther programs Share of US
2010 1 $7,200,000 $7,200,000 — 0.21%
2012 1 $562,500 $562,500 — 0.02%
2014 1 $4,499,866 $4,499,866 — 0.14%
2016 1 $13,146,509 $13,146,509 — 0.40%
2018 2 $12,982,558 $12,982,558 — 0.38%
2019 2 $24,997,892 $24,997,892 — 0.70%
2020 2 $14,964,393 $14,029,119 $935,274 0.31%
2021 1 $1,015,793 $0 $1,015,793 0.01%
2022 2 $1,978,143 $750,000 $1,228,143 0.03%
2023 1 $896,035 $896,035 — 0.01%

Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year.

By categorywhat the money was for
CategoryGrantsAwardedShare
Runways 5 $29,745,594 36%
Safety and security 4 $26,036,623 32%
Buildings, roads and utilities 2 $8,003,871 9.7%
Snow removal and equipment 3 $7,201,165 8.8%
Taxiways 2 $6,000,000 7.3%
Pandemic relief 2 $2,243,936 2.7%
Lighting, signs and navaids 2 $1,700,000 2.1%
Planning and environmental 2 $1,312,500 1.6%

Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.

Awardsnewest first · click a heading to sort · Sponsor: State of Alaska/Department of Transportation & Public Facilities
FY Grant Category Amount Work
2023 3-02-0026-025-2023
2023-08-03
Snow removal and equipment $896,035 Acquire Snow Removal Equipment
2022 3-02-0026-023-2022
2021-12-14
Pandemic relief $1,228,143 General ARPA
2022 3-02-0026-024-2022
2022-08-15
Planning and environmental $750,000 Update Airport Master Plan or Study
2021 3-02-0026-022-2021
2021-04-26
Pandemic relief $1,015,793 CRRSA Act Funds
2020 seq. 20 Buildings, roads and utilities $9,414,131
$8.8M AIP
Construct Snow Removal Equipment Building; Construct Aircraft Rescue & Fire Fighting Building; Construct Service Road; Construct Sand and Chemical Storage Building
2020 seq. 21 Runways $5,550,262
$5.2M AIP
Rehabilitate Runway
2019 3-02-0026-018-2019 Safety and security $16,997,892 Construct Aircraft Rescue & Fire Fighting Building; Construct Building; Construct Snow Removal Equipment Building; Construct Sand and Chemical Storage Building
2019 3-02-0026-019-2019 Taxiways $8,000,000 Reconstruct Taxiway; Rehabilitate Runway Lighting; Rehabilitate Taxiway; Rehabilitate Taxiway Lighting; Rehabilitate Runway
2018 seq. 016 Runways $12,195,466 Rehabilitate Runway Lighting - Phase 1: Design/mobilization; Rehabilitate Taxiway Lighting - Phase 1: Design/Mobilization; Rehabilitate Taxiway - Phase 1: Design/mobilization; Reconstruct Taxiway - Phase 1: Design/Mobilization; Rehabilitate Runway - Phase 1: Design/Mobilization
2018 seq. 017 Safety and security $787,092 Acquire Aircraft Rescue & Fire Fighting Vehicle - Acquire ARFF Vehicle (Barrow - 1,500-Gallon, Index B) (Replacement for vehicle purchased under 3-02-0200-049-2005)
2016 seq. 15 Safety and security $13,146,509 Construct Aircraft Rescue & Fire Fighting Building, Construct Sand and Chemical Storage Building, Construct Snow Removal Equipment Building
2014 seq. 14 Runways $4,499,866 Install Runway Lighting [Install outboard threshold lights], Rehabilitate Runway [Runway rehab (fix bump)] - 07/25
2012 seq. 13 Planning and environmental $562,500 Conduct Airport Master Plan Study [Master Plan Update]
2010 seq. 12 Runways $7,200,000 Construct Runway Safety Area [RSA Phase 4 construction] - 06/24

From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.