KMMH MAMMOTH YOSEMITE
Mammoth Lakes, CA · FAA identifier MMH · Accident history (NTSB)
118°50′19.5″W
Conditions
Category: VFR Wind: 310° at 7 kt Visibility: 10 sm Temp/Dewpoint: 1°C / -4°C Altimeter: 29.91" Hg Sky: 2,300 ft - SCT 3,400 ft - BKN 5,500 ft - OVC Density Alt: 7,177 ft
Category: VFR Wind: 290° at 8 kt Visibility: more than 6 sm Weather: KMMH 162320Z VCSH Sky: 5,000 ft - OVC
Category: MVFR Wind: 270° at 7 kt Visibility: 5 sm Weather: -SHSN Sky: 3,000 ft - OVC
Category: VFR Wind: 280° at 10 kt gust 22 kt Visibility: more than 6 sm Sky: 5,000 ft - OVC
Category: VFR Wind: 290° at 15 kt gust 26 kt Visibility: more than 6 sm Sky: 5,000 ft - FEW
Runways
Frequencies
All frequencies (5)
| Use | Frequency | Sector | Hours |
|---|---|---|---|
| CTAF | 122.800 | ||
| UNICOM | 122.800 | ||
| AWOS-3PT | 118.05 | ||
| OAKLAND CENTER | 125.75 | ||
| OAKLAND CENTER | 284.65 |
Procedures and charts
Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.
NOTAMs
Not for operational use
NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.
PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.
RUNWAYS (2)
Release queue
No departures are waiting on a release time right now.
No recent releases in the current picture.
Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 0341Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Arrivals and departures
No inbound flights in the current picture.
No outbound flights in the current picture.
Flights seen in the last five minutes, as of 0341Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Statistics
Grants
| FY | Grants | Awarded | AIP | Other programs | Share of US |
|---|---|---|---|---|---|
| 2010 | 2 | $330,000 | $330,000 | — | 0.01% |
| 2011 | 1 | $150,000 | $150,000 | — | 0.00% |
| 2012 | 1 | $1,000,000 | $1,000,000 | — | 0.03% |
| 2013 | 3 | $787,573 | $787,573 | — | 0.03% |
| 2014 | 2 | $490,500 | $490,500 | — | 0.01% |
| 2015 | 2 | $1,660,365 | $1,660,365 | — | 0.05% |
| 2016 | 2 | $135,083 | $135,083 | — | 0.00% |
| 2017 | 1 | $635,708 | $635,708 | — | 0.02% |
| 2019 | 2 | $713,023 | $713,023 | — | 0.02% |
| 2020 | 2 | $2,005,436 | $1,818,130 | $187,306 | 0.04% |
| 2021 | 4 | $5,487,293 | $3,079,175 | $2,408,118 | 0.05% |
| 2022 | 2 | $936,625 | $936,625 | — | 0.01% |
| 2023 | 2 | $235,625 | $0 | $235,625 | 0.00% |
| 2024 | 2 | $2,007,204 | $244,329 | $1,762,875 | 0.03% |
| 2025 | 4 | $2,613,923 | $2,122,407 | $491,516 | 0.03% |
Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year.
| Category | Grants | Awarded | Share | |
|---|---|---|---|---|
| Aprons | 4 | $5,494,463 | 29% | |
| Snow removal and equipment | 6 | $3,733,851 | 19% | |
| Pandemic relief | 3 | $2,090,895 | 11% | |
| Terminals | 4 | $1,934,142 | 10% | |
| Buildings, roads and utilities | 2 | $1,871,576 | 9.8% | |
| Planning and environmental | 7 | $1,345,831 | 7.0% | |
| Taxiways | 1 | $1,283,093 | 6.7% | |
| Safety and security | 3 | $868,976 | 4.5% | |
| Lighting, signs and navaids | 1 | $504,505 | 2.6% | |
| Runways | 1 | $61,026 | 0.32% |
Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.
| FY | Grant | Category | Amount | Work |
|---|---|---|---|---|
| 2025 | 3-06-0146-055-2025 2025-08-12 |
Runways | $61,026 | Acquire Runway Temporary Closure Lighting |
| 2025 | 3-06-0146-056-2025 2025-09-18 |
Snow removal and equipment | $1,745,772 | Construct/Expand Snow Removal Equipment Building, Construct/Expand Snow Removal Equipment Building |
| 2025 | 3-06-0146-057-2025 2025-09-18 |
Snow removal and equipment | $315,609 | Construct/Expand Snow Removal Equipment Building |
| 2025 | 3-06-0146-058-2025 2025-09-12 |
Snow removal and equipment | $491,516 | Construct/Expand Snow Removal Equipment Building |
| 2024 | 3-06-0146-053-2024 2024-09-10 |
Snow removal and equipment | $244,329 | Construct/Expand Snow Removal Equipment Building |
| 2024 | 3-06-0146-054-2024 2024-08-12 |
Buildings, roads and utilities | $1,762,875 | Reconstruct Parking Lot |
| 2023 | 3-06-0146-051-2023 2023-09-12 |
Planning and environmental | $126,924 | Conduct or Update Miscellaneous Study |
| 2023 | 3-06-0146-052-2023 2023-09-12 |
Buildings, roads and utilities | $108,701 | Reconstruct Parking Lot |
| 2022 | 3-06-0146-048-2022 2022-09-08 |
Snow removal and equipment | $490,215 | Construct/Rehabilitate/Modify/Expand Snow Removal Equipment Building |
| 2022 | 3-06-0146-049-2022 2022-07-18 |
Snow removal and equipment | $446,410 | Construct/Rehabilitate/Modify/Expand Snow Removal Equipment Building |
| 2021 | 3-06-0146-044-2021 2021-05-17 |
Aprons | $3,396,398 $3.1M AIP |
Reconstruct Apron |
| 2021 | 3-06-0146-045-2021 2021-04-20 |
Pandemic relief | $1,005,885 | CRRSA Act Funds |
| 2021 | 3-06-0146-046-2021 2021-04-20 |
Pandemic relief | $0 | CRRSA Act Concessions |
| 2021 | 3-06-0146-047-2021 2021-08-11 |
Pandemic relief | $1,085,010 | General ARPA |
| 2020 | seq. 41 | Taxiways | $1,283,093 $1.2M AIP |
Rehabilitate Taxiway |
| 2020 | seq. 42 | Safety and security | $722,343 $655K AIP |
Install Perimeter Fencing required by 14 CFR 139 |
| 2019 | 3-06-0146-038-2019 | Lighting, signs and navaids | $504,505 | Install Miscellaneous NAVAIDS |
| 2019 | 3-06-0146-040-2019 | Planning and environmental | $208,518 | Update Airport Master Plan Study |
| 2017 | seq. 37 | Planning and environmental | $635,708 | Conduct Environmental Study |
| 2016 | seq. 34 | Planning and environmental | $45,330 | Conduct Miscellaneous Study |
| 2016 | seq. 35 | Safety and security | $89,753 | Install Perimeter Fencing required by 14 CFR 139 |
| 2015 | seq. 31 | Aprons | $1,607,565 | Rehabilitate Apron |
| 2015 | seq. 33 | Planning and environmental | $52,800 | Conduct Miscellaneous Study |
| 2014 | seq. 29 | Aprons | $355,500 | Rehabilitate Apron [Phase II (construct) - Joint seal and markings (aproximately 30,300 square yards)] |
| 2014 | seq. 30 | Aprons | $135,000 | Rehabilitate Apron [GA apron, Phase I (Design)] |
| 2013 | seq. 26 | Planning and environmental | $96,551 | Update Airport Master Plan Study [Airport Layout Plan and Narrative Report] |
| 2013 | seq. 27 | Safety and security | $56,880 | Wildlife Hazard Assessments |
| 2013 | seq. 28 | Terminals | $634,142 | Conduct Miscellaneous Study [Pavement Maintenance Management Program (Including pavement condition survey)], Rehabilitate Apron [Phase I - Joint seal and markings (Design)], Rehabilitate Taxiway [Phase I - Joint seal and markings (Design)], Rehabilitate Terminal Building |
| 2012 | seq. 25 | Terminals | $1,000,000 | Rehabilitate Terminal Building |
| 2011 | seq. 24 | Terminals | $150,000 | Rehabilitate Terminal Building |
| 2010 | seq. 22 | Terminals | $150,000 | Rehabilitate Terminal Building |
| 2010 | seq. 23 | Planning and environmental | $180,000 | Update Airport Master Plan Study |
From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.
Nearby airports
| Airport | Name | Distance | Bearing | Conditions | Wind |
|---|---|---|---|---|---|
| O24 | LEE VINING | 23.7 nm | 328° NW | — | |
| KBIH | BISHOP | 27.2 nm | 124° SE | VFR | 130° 19G26 kt |
| 2Q9 | DYER | 39.6 nm | 091° E | — |
Private-use fields nearby (2)
| NV27 | CIRCLE L RANCH | 36.3 nm | 081° E | — | |
| 9CA6 | NORTH VALLEY | 38.2 nm | 067° NE | — |
Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.