PGUM GUAM INTL
Tamuning, GU · FAA identifier GUM · Accident history (NTSB)
144°47′49.7″E
Conditions
Category: VFR Wind: 090° at 15 kt Visibility: 10 sm Temp/Dewpoint: 30°C / 24°C Altimeter: 29.95" Hg Sky: 1,900 ft - FEW 4,300 ft - SCT 5,000 ft - SCT Density Alt: 2,148 ft
Category: VFR Wind: 070° at 15 kt gust 24 kt Visibility: more than 6 sm Weather: PGUM 172342Z VCSH Sky: 2,000 ft - SCT
Category: VFR Wind: 070° at 14 kt Visibility: more than 6 sm Weather: VCSH Sky: 1,800 ft - SCT 4,000 ft - SCT
Category: VFR Wind: 070° at 15 kt gust 24 kt Visibility: more than 6 sm Weather: VCSH Sky: 1,800 ft - SCT 4,000 ft - SCT
Runways
Frequencies
All frequencies (11)
| Use | Frequency | Sector | Hours |
|---|---|---|---|
| TOWER | 118.1 | 24 | |
| TOWER | 340.2 | 24 | |
| GND | 121.9 | ||
| GND | 336.4 | ||
| ATIS | 119.0 | ||
| CLEARANCE | 121.9 | ||
| EMERG | 121.5 | ||
| EMERG | 243.0 | ||
| GUAM CENTER | 119.8 | ||
| GUAM CENTER | 269.0 | ||
| RAMP CTL | 121.6 |
Procedures and charts
Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.
NOTAMs
Not for operational use
NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.
PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.
TAXIWAYS (1)
TOWER LIGHTS (1)
AIRPORT & SERVICES (3)
NAV & PROCEDURES (2)
OTHER (3)
Release queue
No departures are waiting on a release time right now.
No recent releases in the current picture.
Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 0305Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Arrivals and departures
No inbound flights in the current picture.
No outbound flights in the current picture.
Flights seen in the last five minutes, as of 0305Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Statistics
Grants
| FY | Grants | Awarded | AIP | Other programs | Tower ops | $ / op | US $ / op | Share of US |
|---|---|---|---|---|---|---|---|---|
| 2010 | 8 | $17,425,000 | $17,425,000 | — | 65,289 | $266.89 | $51.72 | 0.51% |
| 2011 | 3 | $5,680,479 | $5,680,479 | — | 65,639 | $86.54 | $55.49 | 0.16% |
| 2012 | 2 | $7,441,024 | $7,441,024 | — | 67,371 | $110.45 | $53.60 | 0.22% |
| 2013 | 4 | $5,399,586 | $5,399,586 | — | 68,136 | $79.25 | $50.51 | 0.18% |
| 2014 | 2 | $4,507,926 | $4,507,926 | — | 71,228 | $63.29 | $57.58 | 0.14% |
| 2015 | 3 | $6,592,165 | $6,592,165 | — | 73,451 | $89.75 | $52.92 | 0.21% |
| 2016 | 6 | $6,526,726 | $6,526,726 | — | 77,717 | $83.98 | $52.74 | 0.20% |
| 2017 | 4 | $9,700,500 | $9,700,500 | — | 73,665 | $131.68 | $55.49 | 0.29% |
| 2018 | 2 | $20,517,558 | $20,517,558 | — | 72,322 | $283.70 | $60.64 | 0.59% |
| 2019 | 1 | $18,096,429 | $18,096,429 | — | 69,763 | $259.40 | $58.29 | 0.50% |
| 2020 | 2 | $21,326,652 | $20,193,987 | $1,132,665 | 27,647 | $771.39 | $102.15 | 0.44% |
| 2021 | 5 | $27,503,554 | $6,633,222 | $20,870,332 | 22,310 | $1,232.79 | $193.37 | 0.27% |
| 2022 | 2 | $3,585,676 | $2,000,000 | $1,585,676 | 34,995 | $102.46 | $136.54 | 0.05% |
| 2023 | 5 | $36,082,492 | $36,082,492 | — | 45,421 | $794.40 | $129.46 | 0.50% |
| 2024 | 4 | $35,732,751 | $11,106,951 | $24,625,800 | 50,012 | $714.48 | $114.61 | 0.53% |
| 2025 | 9 | $31,337,567 | $15,498,810 | $15,838,757 | — | — | — | 0.35% |
Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year. A year without counts has no tower figures.
Weighted comparison (CircumFlight's own estimate)
An airline operation and a light-aircraft operation are not the same use of an airport, so this view weights itinerant operations before dividing: air carrier 32, air taxi and military 4, general aviation 1, roughly in proportion to fuel burned, and so to the fuel and ticket taxes that fund the Airport and Airway Trust Fund. The weights are CircumFlight's, not the FAA's; local (pattern) operations are left out. The US column uses the same weights over every towered field with an award that year.
| FY | Air carrier | Air taxi + mil. | General aviation | Units | $ / unit | US $ / unit |
|---|---|---|---|---|---|---|
| 2010 | 21,065 | 6,613 | 15,401 | 715,933 | $24.34 | $4.92 |
| 2011 | 20,552 | 5,915 | 16,094 | 697,418 | $8.15 | $5.15 |
| 2012 | 21,811 | 5,936 | 19,615 | 741,311 | $10.04 | $5.09 |
| 2013 | 22,326 | 5,317 | 19,325 | 755,025 | $7.15 | $4.56 |
| 2014 | 22,641 | 3,763 | 21,106 | 760,670 | $5.93 | $5.04 |
| 2015 | 22,727 | 4,195 | 22,814 | 766,858 | $8.60 | $4.33 |
| 2016 | 23,597 | 5,192 | 28,558 | 804,430 | $8.11 | $4.31 |
| 2017 | 22,501 | 4,491 | 30,387 | 768,383 | $12.62 | $4.47 |
| 2018 | 23,273 | 2,060 | 26,840 | 779,816 | $26.31 | $4.76 |
| 2019 | 23,621 | 1,052 | 25,376 | 785,456 | $23.04 | $4.50 |
| 2020 | 10,869 | 1,204 | 7,844 | 360,468 | $59.16 | $9.32 |
| 2021 | 6,099 | 1,169 | 5,466 | 205,310 | $133.96 | $18.37 |
| 2022 | 10,501 | 1,898 | 7,830 | 351,454 | $10.20 | $11.81 |
| 2023 | 15,730 | 2,071 | 9,637 | 521,281 | $69.22 | $10.65 |
| 2024 | 17,206 | 2,376 | 11,030 | 571,126 | $62.57 | $9.06 |
| All | 284,519 | 53,252 | 267,323 | 9,584,939 | $23.59 | — |
| Category | Grants | Awarded | Share | |
|---|---|---|---|---|
| Terminals | 11 | $75,769,244 | 29% | |
| Runways | 13 | $52,316,068 | 20% | |
| Aprons | 6 | $45,334,287 | 18% | |
| Safety and security | 9 | $27,370,822 | 11% | |
| Pandemic relief | 4 | $21,718,984 | 8.4% | |
| Buildings, roads and utilities | 4 | $12,665,801 | 4.9% | |
| Lighting, signs and navaids | 5 | $10,906,987 | 4.2% | |
| Noise mitigation | 3 | $6,000,000 | 2.3% | |
| Planning and environmental | 6 | $4,747,222 | 1.8% | |
| Snow removal and equipment | 1 | $626,670 | 0.24% |
Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.
| FY | Grant | Category | Amount | Work |
|---|---|---|---|---|
| 2025 | 3-66-0001-126-2025 2025-08-04 |
Buildings, roads and utilities | $1,500,000 | Construct Airport Microgrid Power Supply |
| 2025 | 3-66-0001-127-2025 2025-08-21 |
Terminals | $2,000,000 | Reconstruct Terminal |
| 2025 | 3-66-0001-128-2025 2025-08-21 |
Terminals | $1,547,810 | Reconstruct Terminal |
| 2025 | 3-66-0001-129-2025 2025-08-04 |
Terminals | $9,000,000 | Reconstruct Terminal Components |
| 2025 | 3-66-0001-130-2025 2025-08-21 |
Terminals | $6,838,757 | Reconstruct Passenger Boarding Bridges |
| 2025 | 3-66-0001-131-2025 2025-09-18 |
Aprons | $1,215,000 | Construct Apron |
| 2025 | 3-66-0001-132-2025 2025-09-18 |
Terminals | $975,000 | Reconstruct Terminal Components |
| 2025 | 3-66-0001-133-2025 2025-09-18 |
Lighting, signs and navaids | $800,000 | Reconstruct Airport Lighting Vault Equipment |
| 2025 | 3-66-0001-134-2025 2025-09-18 |
Buildings, roads and utilities | $7,461,000 | VALE Infrastructure |
| 2024 | 3-66-0001-122-2024 2024-03-23 |
Planning and environmental | $500,000 | Conduct Energy Efficiency Assessment |
| 2024 | 3-66-0001-123-2024 2024-05-17 |
Terminals | $3,225,800 | Reconstruct Terminal Components |
| 2024 | 3-66-0001-124-2024 2024-09-09 |
Aprons | $10,606,951 | Rehabilitate Apron |
| 2024 | 3-66-0001-125-2024 2024-09-09 |
Terminals | $21,400,000 | Reconstruct Terminal Components |
| 2023 | 3-66-0001-117-2023 2023-08-03 |
Safety and security | $2,553,486 | Construct Aircraft Rescue & Fire Fighting Building |
| 2023 | 3-66-0001-118-2023 2023-08-29 |
Safety and security | $1,200,000 | Install Perimeter Fencing required by 49 CFR 1542 |
| 2023 | 3-66-0001-119-2023 2023-09-08 |
Aprons | $574,901 | Construct Apron |
| 2023 | 3-66-0001-120-2023 2023-09-14 |
Aprons | $31,127,435 | Rehabilitate Apron |
| 2023 | 3-66-0001-121-2023 2023-09-14 |
Snow removal and equipment | $626,670 | Zero Emissions Vehicle/Infrastructure, Zero Emissions Vehicle/Infrastructure, Zero Emissions Vehicle/Infrastructure |
| 2022 | 3-66-0001-115-2022 2022-01-05 |
Pandemic relief | $1,585,676 | Large Concessions |
| 2022 | 3-66-0001-116-2022 2022-08-26 |
Noise mitigation | $2,000,000 | Conduct Noise Compatibility Plan Study |
| 2021 | 3-66-0001-109-2021 2021-04-15 |
Pandemic relief | $5,559,307 | CRRSA Act Funds |
| 2021 | 3-66-0001-110-2021 2021-08-26 |
Runways | $5,148,024 $4.6M AIP |
Rehabilitate Runway |
| 2021 | 3-66-0001-112-2021 2021-04-16 |
Pandemic relief | $396,419 | CRRSA Act Concessions |
| 2021 | 3-66-0001-113-2021 2021-08-26 |
Planning and environmental | $2,222,222 $2.0M AIP |
Update Airport Master Plan or Study |
| 2021 | 3-66-0001-114-2021 2021-08-09 |
Pandemic relief | $14,177,582 | General ARPA |
| 2020 | seq. 107 | Runways | $11,326,652 $10.2M AIP |
Rehabilitate Runway |
| 2020 | seq. 108 | Runways | $10,000,000 | Rehabilitate Runway |
| 2019 | 3-66-0001-106-2019 | Terminals | $18,096,429 | Modify Terminal Building |
| 2018 | seq. 104 | Terminals | $4,474,299 | Modify Terminal Building - Sterile Arrivals Corridor - Phase III |
| 2018 | seq. 105 | Safety and security | $16,043,259 | Construct Aircraft Rescue & Fire Fighting Building - Phase III - Construction. new ARFF building |
| 2017 | seq. 100 | Terminals | $4,450,500 | Modify Terminal Building |
| 2017 | seq. 101 | Safety and security | $3,500,000 | Construct Aircraft Rescue & Fire Fighting Building |
| 2017 | seq. 102 | Aprons | $1,000,000 | Rehabilitate Apron |
| 2017 | seq. 103 | Runways | $750,000 | Rehabilitate Runway - 06L/24R |
| 2016 | seq. 94 | Safety and security | $706,077 | Install Perimeter Fencing required by 14 CFR 139 |
| 2016 | seq. 95 | Safety and security | $100,000 | Wildlife Hazard Assessments |
| 2016 | seq. 96 | Planning and environmental | $150,000 | Prepare SMS Manual and Implementation Plan |
| 2016 | seq. 97 | Terminals | $3,760,649 | Modify Terminal Building |
| 2016 | seq. 98 | Safety and security | $1,000,000 | Construct Aircraft Rescue & Fire Fighting Building |
| 2016 | seq. 99 | Aprons | $810,000 | Rehabilitate Apron |
| 2015 | seq. 91 | Safety and security | $1,251,000 | Acquire Aircraft Rescue & Fire Fighting Vehicle |
| 2015 | seq. 92 | Runways | $3,341,165 | Rehabilitate Runway - 06L/24R |
| 2015 | seq. 93 | Noise mitigation | $2,000,000 | Noise Mitigation Measures for Residences within 65 - 69 DNL |
| 2014 | seq. 89 | Runways | $2,950,939 | Rehabilitate Runway [Phase IV] - 06L/24R |
| 2014 | seq. 90 | Lighting, signs and navaids | $1,556,987 | Install Instrument Approach Aid [Phase III] - 06L/24R |
| 2013 | seq. 85 | Runways | $2,005,605 | Extend Runway 06L/24R [Phase XI] |
| 2013 | seq. 86 | Runways | $1,876,981 | Rehabilitate Runway 06L/24R [Phase III] |
| 2013 | seq. 87 | Safety and security | $1,017,000 | Acquire Aircraft Rescue & Fire Fighting Vehicle |
| 2013 | seq. 88 | Planning and environmental | $500,000 | Update Airport Master Plan Study |
| 2012 | seq. 83 | Runways | $2,000,000 | Extend Runway [Phase X] - 06L/24R |
| 2012 | seq. 84 | Runways | $5,441,024 | Rehabilitate Runway [Phase II] - 06L/24R |
| 2011 | seq. 80 | Runways | $1,975,678 | Extend Runway [Phase IX] - 06L/24R |
| 2011 | seq. 81 | Buildings, roads and utilities | $2,304,801 | Improve Airport Miscellaneous Improvements [Demolish Naval Housing - Ph. III] |
| 2011 | seq. 82 | Buildings, roads and utilities | $1,400,000 | Improve Airport Miscellaneous Improvements [Demolish Naval Housing - Ph. IV] |
| 2010 | seq. 72 | Runways | $4,000,000 | Extend Runway - 06L/24R |
| 2010 | seq. 73 | Runways | $1,500,000 | Rehabilitate Runway [Design only - Ph I] - 06L/24R |
| 2010 | seq. 74 | Lighting, signs and navaids | $2,172,362 | Install Instrument Approach Aid [Phase I] - 06L/24R |
| 2010 | seq. 75 | Noise mitigation | $2,000,000 | Noise Mitigation Measures for Residences within 65 - 69 DNL |
| 2010 | seq. 76 | Lighting, signs and navaids | $1,550,000 | Improve Utilities [MAP] [Sewer and Drainage, Phase I (Design only)] |
| 2010 | seq. 77 | Planning and environmental | $675,000 | Collect airport data for Airports Geographic Information System |
| 2010 | seq. 78 | Lighting, signs and navaids | $4,827,638 | Install Instrument Approach Aid [Phase II] - 06L/24R |
| 2010 | seq. 79 | Planning and environmental | $700,000 | Conduct Environmental Study [Environmental Assessment for utilities improvements] |
From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.
Nearby airports
No public-use airport within 40 nm.
Private-use fields nearby (1)
| PGUA | ANDERSEN AFB | 9.8 nm | 052° NE | VFR | 100° 12G19 kt |
Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.