Airports

KWMC WINNEMUCCA MUNI

Winnemucca, NV · FAA identifier WMC · Accident history (NTSB)

Elevation
4,308 ft
Tower
Uncontrolled
Use
Public
Position
40°53′47.8″N
117°48′21.2″W
Loading the 3D view…
LOOK
MOVE
Airport geometry © OpenStreetMap contributors (ODbL); runways and lighting from FAA NASR.

Conditions

METAR 21 minutes ago
METAR KWMC 171256Z AUTO 28007KT 10SM SCT060 00/00 A2992 RMK AO2 SLP138 T00000000 $
     Category: VFR
         Wind: 280° at 7 kt
   Visibility: 10 sm
Temp/Dewpoint: 0°C / 0°C
    Altimeter: 29.92" Hg
          Sky: 6,000 ft - SCT
TAF 1h 55m ago
Prevailing 1712Z-1812Z NOW
KWMC 171122Z 1712/1812 28006KT 4SM -SHRASN BKN008 OVC010
     Category: IFR
         Wind: 280° at 6 kt
   Visibility: 4 sm
      Weather: KWMC 171122Z -SHRASN
          Sky:   800 ft - BKN
               1,000 ft - OVC
FM 172100Z IN 7h 42m
FM172100 25009KT P6SM BKN030
     Category: MVFR
         Wind: 250° at 9 kt
   Visibility: more than 6 sm
          Sky: 3,000 ft - BKN
FM 180200Z IN 12h 42m
FM180200 18012KT P6SM SCT050
     Category: VFR
         Wind: 180° at 12 kt
   Visibility: more than 6 sm
          Sky: 5,000 ft - SCT
FM 180600Z IN 16h 42m
FM180600 14012KT P6SM SKC
     Category: VFR
         Wind: 140° at 12 kt
   Visibility: more than 6 sm
          Sky: --- ft - SKC

Runways

02/20 4,800 x 75 - ASPH-G
02
3 kt tail, 6 kt cross from left
20
3 kt head, 6 kt cross from right
14/32 7,000 x 100 - ASPH-G
14
4 kt tail, 6 kt cross from right
32
4 kt head, 6 kt cross from left
H1 25 x 25 - CONC-G
H2 25 x 25 - CONC-G
02201432N ↑

Frequencies

CTAF 122.800
UNICOM 122.800
ASOS 120.175
All frequencies (6)
UseFrequencySectorHours
CTAF 122.800
UNICOM 122.800
ASOS 120.175
RNO RCO 122.3
SALT LAKE CITY CENTER 132.25
SALT LAKE CITY CENTER 338.35

Procedures and charts

Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.

NOTAMs

Not for operational use

NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.

PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.

RUNWAYS (2)
RWY 20 PAPI U/S
EFF 052019Z - 060211Z
EXP IN 169d 12h
Runway 20 PAPI unserviceable
RWY 32 PAPI U/S
EFF 052021Z - 060211Z
EXP IN 169d 12h
Runway 32 PAPI unserviceable

Release queue

Awaiting release

No departures are waiting on a release time right now.

Recently released

No recent releases in the current picture.

Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 1317Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Arrivals and departures

Arrivals

No inbound flights in the current picture.

Departures

No outbound flights in the current picture.

Flights seen in the last five minutes, as of 1316Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Statistics

Grants

Awarded FY2010–FY2025
$10.7M
$10,664,593 in 20 grants
AIP share
96%
$10.2M AIP · $112K relief · $337K infrastructure law
Rank, United States
0.01% of all awards FY2010–FY2025
Rank, NV
0.90% of the state's airport awards
$0$625K$1.3M$1.9M$2.5M'10FY2010: $28,500'11FY2011: $586,248'12'13FY2013: $334,899'14FY2014: $223,851'15FY2015: $75,000'16FY2016: $1,211,207'17FY2017: $1,749,643'18FY2018: $460,815'19FY2019: $2,149,449'20'21FY2021: $1,312,309FY2021: $1,312,309'22FY2022: $154,471'23'24'25FY2025: $2,378,201FY2025: $2,378,201
AIP Pandemic relief, ARRA Infrastructure law (AIG, ATRM, FCT)
By fiscal year
FYGrantsAwardedAIPOther programs Share of US
2010 1 $28,500 $28,500 — 0.00%
2011 2 $586,248 $586,248 — 0.02%
2013 3 $334,899 $334,899 — 0.01%
2014 1 $223,851 $223,851 — 0.01%
2015 1 $75,000 $75,000 — 0.00%
2016 1 $1,211,207 $1,211,207 — 0.04%
2017 1 $1,749,643 $1,749,643 — 0.05%
2018 2 $460,815 $460,815 — 0.01%
2019 1 $2,149,449 $2,149,449 — 0.06%
2021 4 $1,312,309 $1,200,388 $111,921 0.01%
2022 1 $154,471 $154,471 — 0.00%
2025 2 $2,378,201 $2,040,826 $337,375 0.03%

Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year.

By categorywhat the money was for
CategoryGrantsAwardedShare
Taxiways 5 $5,124,676 48%
Aprons 4 $3,392,942 32%
Runways 3 $909,347 8.5%
Lighting, signs and navaids 2 $561,226 5.3%
Land and easements 3 $260,729 2.4%
Snow removal and equipment 1 $217,287 2.0%
Safety and security 1 $92,386 0.87%
Planning and environmental 1 $75,000 0.70%
Pandemic relief 2 $31,000 0.29%

Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.

Awardsnewest first · click a heading to sort · Sponsor: City of Winnemucca
FY Grant Category Amount Work
2025 3-32-0021-034-2025
2025-07-01
Lighting, signs and navaids $337,375 Install Runway Visual Guidance System, Install Runway Visual Guidance System, Install Taxiway Signage/Markings, Install Taxiway Signage/Markings, Install Wind Cone/Segmented Circle
2025 3-32-0021-035-2025
2025-08-28
Taxiways $2,040,826 Reconstruct Apron, Reconstruct Taxiway
2022 3-32-0021-033-2022
2022-06-22
Aprons $154,471 Rehabilitate Apron
2021 3-32-0021-029-2021
2021-06-03
Snow removal and equipment $217,287
$204K AIP
Acquire Snow Removal Equipment
2021 3-32-0021-030-2021
2021-06-23
Aprons $1,064,022
$997K AIP
Reconstruct Apron
2021 3-32-0021-031-2021
2021-04-21
Pandemic relief $9,000 CRRSA Act Funds
2021 3-32-0021-032-2021
2021-08-26
Pandemic relief $22,000 General ARPA
2019 3-32-0021-027-2019 Aprons $2,149,449 Expand Apron; Reconstruct Apron
2018 seq. 025 Runways $396,099 Rehabilitate Apron - Crack/Fog Seal Apron; Rehabilitate Taxiway - Crack/Fog Seal Taxiways; Rehabilitate Runway - Crack/Fog Seal and Remark RWY 14/32; Rehabilitate Runway - Crack/Fog Seal and Remark RWY 02/20
2018 seq. 026 Land and easements $64,716 Acquire Land For Approaches - Acquire 30 acres of RWY 32 RPZ land
2017 seq. 24 Taxiways $1,749,643 Rehabilitate Taxiway [Taxiway A], Rehabilitate Taxiway [Taxiway B]
2016 seq. 23 Taxiways $1,211,207 Construct Taxiway
2015 seq. 22 Taxiways $75,000 Construct Taxiway
2014 seq. 21 Lighting, signs and navaids $223,851 Install Airfield Guidance Signs, Install Emergency Generator
2013 seq. 18 Land and easements $167,513 Acquire Land For Approaches
2013 seq. 19 Planning and environmental $75,000 Update Airport Master Plan Study [Airport Layout Plan and Narrative Report]
2013 seq. 20 Safety and security $92,386 Install Perimeter Fencing
2011 seq. 16 Runways $502,803 Rehabilitate Access Road [slurry sesal access road], Rehabilitate Apron [Slurry Seal Tie down Aprons including misc. improvements], Rehabilitate Runway - 02/20, Rehabilitate Runway - 14/32, Rehabilitate Taxiway [Slurry Seal Taxiways A, B, C, D, A1, A2, A3, A4]
2011 seq. 17 Runways $83,445 Rehabilitate Runway - 14/32
2010 seq. 15 Land and easements $28,500 Conduct Environmental Study [ALP update & revise/supplement EA for proposed land acquistion], Update Miscellaneous Study [Update Airport Layout Plan]

From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.

Nearby airports

No public-use airport within 40 nm.

Private-use fields nearby (3)
NV47 NEW FARM 18.2 nm 045° NE —
NV68 16 MILE ROAD 20.7 nm 025° NE —
NV88 MORRIS AG AIR 39.4 nm 358° N —

Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.