KCEC JACK MC NAMARA FLD
Crescent City, CA · FAA identifier CEC · Accident history (NTSB)
124°14′11.5″W
Conditions
Category: VFR Wind: 100° at 3 kt Visibility: 10 sm Temp/Dewpoint: 9°C / 8°C Altimeter: 30.11" Hg Sky: 3,700 ft - FEW
Category: VFR Wind: 200° at 6 kt Visibility: more than 6 sm Weather: KCEC 162338Z VCSH Sky: 5,000 ft - BKN 25,000 ft - BKN
Category: VFR Wind: 100° at 4 kt Visibility: more than 6 sm Sky: 25,000 ft - BKN
Category: VFR Weather: -SHRA Sky: 5,000 ft - BKN
Category: VFR Wind: 160° at 12 kt gust 19 kt Visibility: more than 6 sm Sky: 10,000 ft - BKN
Category: VFR Wind: 170° at 18 kt gust 27 kt Visibility: more than 6 sm Sky: 25,000 ft - BKN
Runways
Frequencies
All frequencies (6)
| Use | Frequency | Sector | Hours |
|---|---|---|---|
| CTAF | 122.800 | ||
| UNICOM | 122.800 | ||
| ASOS | 119.925 | ||
| OAK RCO | 122.3 | ||
| SEATTLE CENTER | 124.85 | ||
| SEATTLE CENTER | 306.3 |
Procedures and charts
Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.
NOTAMs
Not for operational use
NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.
PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.
RUNWAYS (3)
TAXIWAYS (2)
TOWER LIGHTS (1)
Release queue
No departures are waiting on a release time right now.
No recent releases in the current picture.
Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 0341Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Arrivals and departures
No inbound flights in the current picture.
No outbound flights in the current picture.
Flights seen in the last five minutes, as of 0341Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.
Statistics
Grants
| FY | Grants | Awarded | AIP | Other programs | Share of US |
|---|---|---|---|---|---|
| 2010 | 2 | $354,647 | $354,647 | — | 0.01% |
| 2011 | 1 | $1,654,694 | $1,654,694 | — | 0.05% |
| 2012 | 2 | $3,345,306 | $3,345,306 | — | 0.10% |
| 2014 | 3 | $16,836,262 | $16,836,262 | — | 0.51% |
| 2015 | 1 | $5,043,438 | $5,043,438 | — | 0.16% |
| 2016 | 3 | $16,999,275 | $16,999,275 | — | 0.52% |
| 2018 | 1 | $99,510 | $99,510 | — | 0.00% |
| 2019 | 2 | $1,405,398 | $1,405,398 | — | 0.04% |
| 2020 | 2 | $408,470 | $388,047 | $20,423 | 0.01% |
| 2021 | 4 | $966,706 | $840,472 | $126,234 | 0.01% |
| 2022 | 1 | $19,236 | $0 | $19,236 | 0.00% |
| 2024 | 1 | $7,260,839 | $7,260,839 | — | 0.11% |
| 2025 | 1 | $856,643 | $0 | $856,643 | 0.01% |
Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year.
| Category | Grants | Awarded | Share | |
|---|---|---|---|---|
| Runways | 9 | $32,357,128 | 59% | |
| Terminals | 6 | $20,212,921 | 37% | |
| Safety and security | 4 | $2,137,164 | 3.9% | |
| Planning and environmental | 4 | $461,211 | 0.83% | |
| Pandemic relief | 2 | $82,000 | 0.15% |
Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.
| FY | Grant | Category | Amount | Work |
|---|---|---|---|---|
| 2025 | 3-06-0057-049-2025 2025-08-25 |
Safety and security | $856,643 | Reconstruct Wildlife Perimeter Fencing |
| 2024 | 3-06-0057-048-2024 2024-08-16 |
Runways | $7,260,839 | Rehabilitate Runway |
| 2022 | 3-06-0057-047-2022 2022-09-07 |
Safety and security | $19,236 | Install Perimeter Fencing not Required by 49 CFR 1542 |
| 2021 | 3-06-0057-043-2021 2021-06-14 |
Safety and security | $570,894 $542K AIP |
Acquire Aircraft Rescue & Fire Fighting Vehicle |
| 2021 | 3-06-0057-044-2021 2021-06-14 |
Runways | $313,812 $298K AIP |
Rehabilitate Runway |
| 2021 | 3-06-0057-045-2021 2021-04-20 |
Pandemic relief | $23,000 | CRRSA Act Funds |
| 2021 | 3-06-0057-046-2021 2021-08-11 |
Pandemic relief | $59,000 | General ARPA |
| 2020 | seq. 40 | Runways | $333,470 $317K AIP |
Rehabilitate Runway |
| 2020 | seq. 41 | Planning and environmental | $75,000 $71K AIP |
Conduct or Update Miscellaneous Study |
| 2019 | 3-06-0057-038-2019 | Runways | $715,007 | Improve Runway Safety Area; Construct Terminal Building |
| 2019 | 3-06-0057-039-2019 | Safety and security | $690,391 | Remove Obstructions [Non-Hazard] |
| 2018 | seq. 037 | Planning and environmental | $99,510 | Update Airport Master Plan Study - Update Airport Layout Plan Narrative Report with ALP drawing set. |
| 2016 | seq. 32 | Terminals | $5,632,574 | Construct Terminal Building |
| 2016 | seq. 33 | Planning and environmental | $66,701 | Conduct Miscellaneous Study |
| 2016 | seq. 34 | Terminals | $11,300,000 | Construct Terminal Building |
| 2015 | seq. 31 | Runways | $5,043,438 | Improve Runway Safety Area - 11/29 |
| 2014 | seq. 28 | Runways | $2,435,586 | Improve Runway Safety Area [Land Acquisition required for environmental mitigation for Runway 11/29 & 17/35 RSA improvements] - 11/29 |
| 2014 | seq. 29 | Runways | $9,235,676 | Improve Runway Safety Area [Improve RSA grading and filling compliance - Construct] - 11/29, Improve Runway Safety Area [Improve RSA grading and filling compliance - Construct] - 17/35 |
| 2014 | seq. 30 | Runways | $5,165,000 | Improve Runway Safety Area [Wetlands mitigation required for Runway 11/29 & 17/35 RSA Improvements - Phase 1] - 11/29 |
| 2012 | seq. 26 | Runways | $1,982,783 | Improve Runway Safety Area [Design of RSA grading and filling compliance and Mitigation, Phase II] - 11/29, Improve Runway Safety Area [Design of RSA grading and filling compliance and mitigation plan, Phase II] - 17/35 |
| 2012 | seq. 27 | Terminals | $1,362,523 | Construct Terminal Building [Construct replacement terminal building (final design for building and infrastructue; initial Reimburseble Agreement for NAVAID relocation)] |
| 2011 | seq. 25 | Terminals | $1,654,694 | Construct Terminal Building [Construct replacement terminal building - Phase I Design], Install Miscellaneous NAVAIDS [Relocate lighted windcone], Rehabilitate Airport Beacons [Replace existing beacon], Rehabilitate Runway [Pavement strength evaluation for Runways 11/29 & 17/39, associated taxiways and aprons, and engineering design for minor pavement repair and numerals and runway marking changes due to change in magnetic inclination.] - 11/29 |
| 2010 | seq. 23 | Terminals | $134,647 | Conduct Environmental Study [Phase II EA for proposed Terminal] |
| 2010 | seq. 24 | Planning and environmental | $220,000 | Collect airport data for Airports Geographic Information System, Update Airport Master Plan Study |
From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.
Nearby airports
| Airport | Name | Distance | Bearing | Conditions | Wind |
|---|---|---|---|---|---|
| 0O9 | WARD FLD | 11.9 nm | 071° E | — | |
| KBOK | BROOKINGS | 17.8 nm | 352° N | VFR | Calm |
| S51 | ANDY MC BETH | 19.4 nm | 146° SE | — | |
| 3S4 | ILLINOIS VALLEY | 31.5 nm | 052° NE | — | |
| 36S | HAPPY CAMP | 38.0 nm | 089° E | — | |
| 4S1 | GOLD BEACH MUNI | 39.0 nm | 348° N | — |
Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.