Airports

KERI ERIE INTL/TOM RIDGE FLD

Erie, PA · FAA identifier ERI · Accident history (NTSB)

Elevation
732 ft
Tower
Towered
Hrs (local): 0600-0000
Use
Public
Position
42°04′59.1″N
080°10′26.2″W
Loading the 3D view…
LOOK
MOVE
Airport geometry © OpenStreetMap contributors (ODbL); runways and lighting from FAA NASR.

Conditions

METAR 56 minutes ago
METAR KERI 170151Z 23004KT 10SM OVC026 07/02 A3053 RMK AO2 SLP342 T00720017 $
     Category: MVFR
         Wind: 230° at 4 kt
   Visibility: 10 sm
Temp/Dewpoint: 7°C / 2°C
    Altimeter: 30.53" Hg
          Sky: 2,600 ft - OVC
TAF 3h 10m ago
Prevailing 1700Z-1724Z NOW
KERI 162337Z 1700/1724 23006KT P6SM OVC025
     Category: MVFR
         Wind: 230° at 6 kt
   Visibility: more than 6 sm
      Weather: KERI 162337Z
          Sky: 2,500 ft - OVC
FM 170300Z IN 12m
FM170300 22005KT P6SM SCT029
     Category: VFR
         Wind: 220° at 5 kt
   Visibility: more than 6 sm
          Sky: 2,900 ft - SCT
FM 171000Z IN 7h 12m
FM171000 21006KT P6SM SCT250
     Category: VFR
         Wind: 210° at 6 kt
   Visibility: more than 6 sm
          Sky: 25,000 ft - SCT

Runways

02/20 3,508 x 150 - ASPH-F
02
3 kt tail, 3 kt cross from left
20
3 kt head, 3 kt cross from right
06/24 8,420 x 150 - ASPH-G
06
4 kt tail
24
4 kt head
02200624N ↑

Frequencies

TOWER 118.1
TOWER 257.8
GND 121.9
CTAF 118.100
UNICOM 122.950
ASOS 120.35
ATIS 120.35
CLEARANCE 126.8
All frequencies (17)
UseFrequencySectorHours
TOWER 118.1 0600-0000
TOWER 257.8 0600-0000
GND 121.9
CTAF 118.100
UNICOM 122.950
ASOS 120.35
ATIS 120.35
CLEARANCE 126.8
BUFFALO APCH DEP 121.0
BUFFALO APCH DEP 257.8
BUFFALO TRSA 121.0
BUFFALO TRSA 257.8
CLEVELAND CENTER 127.075
CLEVELAND CENTER 292.175
EMERG 121.5
EMERG 243.0
TRSA 257.8

Procedures and charts

Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.

NOTAMs

Not for operational use

NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.

PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.

TOWER LIGHTS (2)
OBST TOWER LGT (ASR 1022725) 415756.60N0801908.60W (9.6NM SW ERI) 1165.0FT (289.0FT AGL) U/S
EFF 020745Z - 300745Z
EXP IN 74d 04h
Obstacle tower light (ASR 1022725) 415756.60N0801908.60W (9.6NM SW ERI) 1165.0FT (289.0FT AGL) unserviceable
OBST TOWER LGT (ASR 1332260) 415704.10N0801323.30W (8.13NM SSW ERI) 1452.74FT (260.17FT AGL) U/S
EFF 220836Z - 060836Z
EXP IN 19d 05h
Obstacle tower light (ASR 1332260) 415704.10N0801323.30W (8.13NM SSW ERI) 1452.74FT (260.17FT AGL) unserviceable
AIRPORT & SERVICES (1)
SVC PCL RWY 20 VASI U/S
EFF 021746Z - 050100Z
EXP IN 199d 22h
Service pilot controlled lighting Runway 20 VASI unserviceable
NAV & PROCEDURES (1)
COM REMOTE TRANS/REC 121.0, 121.5, 243.0, 124.65, 257.8 U/S
INACTIVE
EFF 170500Z - 171000Z
BEGINS IN 2h 12m
Communications REMOTE TRANS/REC 121.0, 121.5, 243.0, 124.65, 257.8 unserviceable

Release queue

Awaiting release

No departures are waiting on a release time right now.

Recently released

No recent releases in the current picture.

Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 0247Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Arrivals and departures

Arrivals
FlightTypeFromNow
SKW6188 CRJ7 KORD Not departed
PDT5821 E145 KCLT 14 nm · 6,500 ft · 253 kt · ~3 min
Departures

No outbound flights in the current picture.

Flights seen in the last five minutes, as of 0247Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Statistics

Grants

Awarded FY2010–FY2025
$70.1M
$70,066,211 in 35 grants
AIP share
77%
$53.9M AIP · $10.6M relief · $5.6M infrastructure law
Rank, United States
0.09% of all awards FY2010–FY2025
Rank, PA
4.0% of the state's airport awards
Per tower operation
$190.97 #39 of 471
$65.4M over 342,420 ops in 14 award years
$0$5.0M$10.0M$15.0M$20.0M'10FY2010: $6,654,955'11FY2011: $11,634,767'12FY2012: $2,359,571'13FY2013: $5,974,834'14FY2014: $1,347,762'15FY2015: $1,347,844'16FY2016: $1,270,986'17FY2017: $1,449,169'18FY2018: $954,052'19'20FY2020: $3,620,577FY2020: $3,620,577'21FY2021: $10,168,536'22FY2022: $9,460,432FY2022: $9,460,432FY2022: $9,460,432'23FY2023: $4,879,847FY2023: $4,879,847'24FY2024: $4,268,235FY2024: $4,268,235'25FY2025: $4,674,644FY2025: $4,674,644
AIP Pandemic relief, ARRA Infrastructure law (AIG, ATRM, FCT)
By fiscal yeartower operations are calendar years
FYGrantsAwardedAIPOther programs Tower ops$ / opUS $ / op Share of US
2010 3 $6,654,955 $6,654,955 — 30,283 $219.76 $51.72 0.19%
2011 2 $11,634,767 $11,634,767 — 26,306 $442.29 $55.49 0.34%
2012 1 $2,359,571 $2,359,571 — 25,260 $93.41 $53.60 0.07%
2013 1 $5,974,834 $5,974,834 — 21,263 $281.00 $50.51 0.20%
2014 1 $1,347,762 $1,347,762 — 19,276 $69.92 $57.58 0.04%
2015 3 $1,347,844 $1,347,844 — 21,287 $63.32 $52.92 0.04%
2016 3 $1,270,986 $1,270,986 — 26,972 $47.12 $52.74 0.04%
2017 3 $1,449,169 $1,449,169 — 23,976 $60.44 $55.49 0.04%
2018 2 $954,052 $954,052 — 25,468 $37.46 $60.64 0.03%
2020 1 $3,620,577 $3,329,511 $291,066 15,356 $235.78 $102.15 0.07%
2021 4 $10,168,536 $0 $10,168,536 26,071 $390.03 $193.37 0.10%
2022 4 $9,460,432 $9,020,986 $439,446 24,148 $391.77 $136.54 0.12%
2023 2 $4,879,847 $2,420,405 $2,459,442 26,437 $184.58 $129.46 0.07%
2024 2 $4,268,235 $3,113,899 $1,154,336 30,317 $140.79 $114.61 0.06%
2025 3 $4,674,644 $3,024,821 $1,649,823 — — — 0.05%

Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year. A year without counts has no tower figures.

Weighted comparison (CircumFlight's own estimate)

An airline operation and a light-aircraft operation are not the same use of an airport, so this view weights itinerant operations before dividing: air carrier 32, air taxi and military 4, general aviation 1, roughly in proportion to fuel burned, and so to the fuel and ticket taxes that fund the Airport and Airway Trust Fund. The weights are CircumFlight's, not the FAA's; local (pattern) operations are left out. The US column uses the same weights over every towered field with an award that year.

FYAir carrierAir taxi + mil.General aviationUnits$ / unitUS $ / unit
2010 58 9,239 8,982 47,794 $139.24 $4.92
2011 50 8,623 8,351 44,443 $261.79 $5.15
2012 16 8,140 8,761 41,833 $56.40 $5.09
2013 12 7,969 6,893 39,153 $152.60 $4.56
2014 10 6,767 7,041 34,429 $39.15 $5.04
2015 128 6,496 7,792 37,872 $35.59 $4.33
2016 20 6,542 8,479 35,287 $36.02 $4.31
2017 16 6,525 8,983 35,595 $40.71 $4.47
2018 4 6,811 9,237 36,609 $26.06 $4.76
2020 449 4,069 5,854 36,498 $99.20 $9.32
2021 1,066 4,177 7,990 58,810 $172.90 $18.37
2022 251 5,037 7,445 35,625 $265.56 $11.81
2023 54 5,200 8,326 30,854 $158.16 $10.65
2024 48 4,903 9,840 30,988 $137.74 $9.06
All 2,182 90,498 113,974 545,790 $119.81 —
By categorywhat the money was for
CategoryGrantsAwardedShare
Runways 8 $27,735,226 40%
Taxiways 11 $20,908,403 30%
Pandemic relief 5 $10,259,962 15%
Snow removal and equipment 4 $5,353,531 7.6%
Aprons 1 $4,000,000 5.7%
Planning and environmental 2 $1,087,755 1.6%
Safety and security 3 $409,382 0.58%
Lighting, signs and navaids 1 $311,952 0.45%

Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.

Awardsnewest first · click a heading to sort · Sponsor: Erie Regional Airport Authority
FY Grant Category Amount Work
2025 3-42-0030-085-2025
2025-06-18
Taxiways $1,031,697 Reconstruct Taxiway
2025 3-42-0030-086-2025
2025-07-29
Taxiways $618,126 Extend/Expand Taxiway, Realign Taxiway
2025 3-42-0030-087-2025
2025-09-18
Taxiways $3,024,821 Reconstruct Taxiway
2024 3-42-0030-083-2024
2024-09-05
Taxiways $1,154,336 Reconstruct Taxiway
2024 3-42-0030-084-2024
2024-09-06
Taxiways $3,113,899 Reconstruct Taxiway
2023 3-42-0030-081-2023
2023-06-13
Taxiways $2,459,442 Reconstruct Taxiway
2023 3-42-0030-082-2023
2023-09-09
Taxiways $2,420,405 Reconstruct Taxiway
2022 3-42-0030-077-2022
2021-12-20
Pandemic relief $91,426 Large Concessions
2022 3-42-0030-078-2022
2022-08-09
Taxiways $5,020,986 Reconstruct Taxiway
2022 3-42-0030-079-2022
2022-09-07
Taxiways $348,020 Reconstruct Taxiway
2022 3-42-0030-080-2022
2022-09-01
Aprons $4,000,000 Rehabilitate Apron
2021 3-42-0030-073-2021
2021-04-15
Pandemic relief $1,371,353 CRRSA Act Funds
2021 3-42-0030-074-2021
2021-05-11
Pandemic relief $22,857 CRRSA Act Concessions
2021 3-42-0030-075-2021
2021-08-26
Pandemic relief $6,913,395 Construct Deicing Containment Facility,Expand Apron
2021 3-42-0030-076-2021
2021-08-16
Pandemic relief $1,860,931 General ARPA
2020 seq. 72 Snow removal and equipment $3,620,577
$3.3M AIP
Construct Snow Removal Equipment Building
2018 seq. 069 Snow removal and equipment $642,100 Acquire Snow Removal Equipment - Liquid Material Spreader and Snow Blower
2018 seq. 070 Lighting, signs and navaids $311,952 Construct Snow Removal Equipment Building - Design
2017 seq. 66 Runways $752,855 Reconstruct Runway - 02/20
2017 seq. 67 Taxiways $368,909 Reconstruct Taxiway
2017 seq. 68 Safety and security $327,405 Install Perimeter Fencing not Required by 49 CFR 1542
2016 seq. 63 Planning and environmental $312,180 Update Airport Master Plan Study
2016 seq. 64 Snow removal and equipment $553,062 Acquire Snow Removal Equipment
2016 seq. 65 Runways $405,744 Rehabilitate Runway - 02/20, Rehabilitate Taxiway
2015 seq. 60 Safety and security $34,477 Security Enhancements
2015 seq. 61 Snow removal and equipment $537,792 Acquire Snow Removal Equipment
2015 seq. 62 Planning and environmental $775,575 Update Airport Master Plan Study
2014 seq. 59 Taxiways $1,347,762 Rehabilitate Taxiway [Taxiways A1,A2,A3,D,E,F]
2013 seq. 58 Runways $5,974,834 Rehabilitate Runway 06/24
2012 seq. 57 Runways $2,359,571 Acquire Land For Approaches [Runwway 6/24 RPZ, Phase VI], Improve Runway Safety Area [Phase VIII] - 06/24
2011 seq. 55 Runways $7,034,767 Extend Runway [Phase IX] - 06/24, Improve Runway Safety Area [Phase VI] - 06/24
2011 seq. 56 Runways $4,600,000 Extend Runway [Phase X] - 06/24, Improve Runway Safety Area [Phase VII] - 06/24
2010 seq. 51 Runways $617,234 Acquire Land For Approaches [Runway 6/24, Phase IV], Construct Sand and Chemical Storage Building
2010 seq. 53 Runways $5,990,221 Acquire Land For Approaches [Runway 6.24, Phase V], Extend Runway [Phase VIII] - 06/24, Improve Runway Safety Area [Phase V] - 06/24
2010 seq. 54 Safety and security $47,500 Wildlife Hazard Assessments [(Plan)]

From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.

Nearby airports

AirportNameDistanceBearingConditionsWind
C28 PRESQUE ISLE BAY 5.1 nm 040° NE —
03G THERMAL-G 5.9 nm 129° SE —
E75 PRESQUE ISLE 6.0 nm 028° NE —
D88 PRATT'S EASTERN DIVIDE 22.1 nm 079° E —
8G2 CORRY-LAWRENCE 26.0 nm 114° SE —
KGKJ PORT MEADVILLE 27.5 nm 184° S —
KHZY NORTHEAST OHIO RGNL 29.7 nm 232° SW MVFR 220° 4 kt
D79 DART 32.7 nm 070° E —
6G1 TITUSVILLE 34.4 nm 146° SE —
4G1 GREENVILLE MUNI 39.4 nm 194° S —
Private-use fields nearby (25)
PN18 FAIRVIEW EVERGREEN 4.6 nm 223° SW —
PA02 DILLEN PERSONAL 6.0 nm 184° S —
PN40 MOORHEAD AIRPARK 13.7 nm 064° NE —
PS05 G & N 15.4 nm 216° SW —
PS64 MORTON'S 16.1 nm 165° S —
07PA DREAM AIR 17.3 nm 217° SW —
75PA MARTHER FLD 17.9 nm 225° SW —
PA52 OBERLANDER 18.0 nm 138° SE —
3PN6 GRAVEL RUN 20.4 nm 168° S —
0OI6 VICTOR'S LANDING 25.6 nm 235° SW —
PA01 MERRYS PYMATUNING 27.1 nm 206° SW —
0PN5 NICHOLS 31.5 nm 125° SE —
8OH8 ALLEN 33.8 nm 223° SW —
3OH4 RICELAND AERODROME 34.3 nm 213° SW —
65NY CHAUTAUQUA LAKE AIRPARK 34.6 nm 069° E —
NY89 GOOSE CREEK 34.9 nm 090° E —
98OH PAINE'S 35.3 nm 244° SW —
0PN8 SHRIVER 35.6 nm 142° SE —
OI71 GERMACK 37.4 nm 241° SW —
OH12 OLD HICKORY AIRPARK 38.0 nm 246° SW —
OA07 HEMLOCK FLD 38.3 nm 233° SW —
55NY RIDGEVIEW 38.4 nm 090° E —
0PN0 LAKEVIEW 38.5 nm 179° S —
0PA5 FISHER 38.5 nm 156° SE —
NY39 HARD BARN CARGAS FARM 38.6 nm 077° E —

Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.