Airports

KACK NANTUCKET MEML

Nantucket, MA · FAA identifier ACK · Accident history (NTSB)

Elevation
47 ft
Tower
Towered
Hrs (local): 0600-2200 MAY 15-SEP 30; 0600-2100 OCT 1-MAY 14
Use
Public
Position
41°15′11.9″N
070°03′37.8″W
Loading the 3D view…
LOOK
MOVE
Airport geometry © OpenStreetMap contributors (ODbL); runways and lighting from FAA NASR.

Conditions

METAR 41 minutes ago
METAR KACK 162053Z 10SM CLR 08/02 A3031 RMK AO2 SLP262 T00780022 53007
     Category: VFR
         Wind: calm
   Visibility: 10 sm
Temp/Dewpoint: 8°C / 2°C
    Altimeter: 30.31" Hg
          Sky: --- ft - CLR
TAF 4h 14m ago
Prevailing 1618Z-1718Z NOW
KACK 161720Z 1618/1718 32010KT P6SM SKC
     Category: VFR
         Wind: 320° at 10 kt
   Visibility: more than 6 sm
      Weather: KACK 161720Z
          Sky: --- ft - SKC
FM 162200Z IN 25m
FM162200 31004KT P6SM FEW250
     Category: VFR
         Wind: 310° at 4 kt
   Visibility: more than 6 sm
          Sky: 25,000 ft - FEW
FM 170900Z IN 11h 25m
FM170900 30008KT P6SM SKC
     Category: VFR
         Wind: 300° at 8 kt
   Visibility: more than 6 sm
          Sky: --- ft - SKC

Runways

06/24 6,303 x 150 - ASPH-G
06
24
15/33 4,500 x 100 - ASPH-G
15
33
06241533N ↑

Frequencies

TOWER 118.3
GND 132.5
CTAF 118.300
UNICOM 122.950
ATIS 127.5
CLEARANCE 119.375
All frequencies (13)
UseFrequencySectorHours
TOWER 118.3 0600-2200 MAY 15-SEP 30; 0600-2100 OCT 1-MAY 14
GND 132.5
CTAF 118.300
UNICOM 122.950
ATIS 127.5
CLEARANCE 119.375
EMERG 121.5
EMERG 243.0
MERRIMACK APCH DEP 126.1
MERRIMACK APCH DEP 318.1
MERRIMACK CLAMY STAR 133.75
MERRIMACK CLAMY STAR 318.1
MERRIMACK DEEPO STAR 133.75

Procedures and charts

Charts open from the FAA's digital Terminal Procedures Publication, cycle 2612, effective 11/26/2026 12:00:00 AM to 12/24/2026 12:00:00 AM. Not for navigation; check the cycle before flight.

NOTAMs

Not for operational use

NOTAMs as captured by CircumFlight from the FAA's NOTAM distribution; not FAA data, and not necessarily complete or current. Always get an official briefing before flight.

PLAIN-LANGUAGE READING - BEST EFFORT. Abbreviations are expanded automatically and may be wrong or incomplete. The raw NOTAM above is the official text; fly by it, not by this.

RUNWAYS (1)
RWY 24 PAPI U/S
INACTIVE
EFF 171500Z - 171700Z
BEGINS IN 17h 25m
Runway 24 PAPI unserviceable
AIRPORT & SERVICES (2)
AD AP ARFF NOW INDEX B
EFF 011100Z - 011000Z
EXP IN 165d 12h
Aerodrome airport aircraft rescue and firefighting NOW INDEX B
AD AP ARFF NOW INDEX B
EFF 011100Z - 011000Z
EXP IN 165d 12h
Aerodrome airport aircraft rescue and firefighting NOW INDEX B

Release queue

Awaiting release

No departures are waiting on a release time right now.

Recently released

No recent releases in the current picture.

Release times (the slot at the departure fix) and delay causes from traffic management, derived by CircumFlight, as of 2134Z; not FAA data and not for operational use. Get your release from ATC. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Arrivals and departures

Arrivals
FlightTypeFromNow
AMF6601 BE99 KMHT 22 nm · 3,700 ft · 194 kt · ~7 min
KAP818 C402 KBOS 60 nm · 5,000 ft · 175 kt · ~21 min
N5015F EVSS KBDL 61 nm · 5,800 ft · 106 kt · ~35 min
EJA799 CL35 KBOS 64 nm · 9,000 ft · 299 kt · ~13 min
N39CA PA31 KJPX 122 nm · 5,500 ft · 174 kt · ~42 min
GPD853 PC12 KHPN 150 nm · 8,900 ft · 206 kt · ~44 min
Departures

No outbound flights in the current picture.

Flights seen in the last five minutes, as of 2134Z. A departure at a gate has its departure clearance and has not yet moved; a place marked (est.) is the nearest stand to the aircraft's last surface position. Derived by CircumFlight from air traffic management feeds; not FAA data and not for operational use. Times are estimates from distance and ground speed. Aircraft whose owners have asked the FAA to limit the display of their flights are not shown.

Statistics

Grants

Awarded FY2010–FY2025
$92.6M
$92,619,783 in 40 grants
AIP share
89%
$82.2M AIP · $6.3M relief · $4.1M infrastructure law
Rank, United States
0.12% of all awards FY2010–FY2025
Rank, MA
7.2% of the state's airport awards
Per tower operation
$89.6M over 1,370,244 ops in 15 award years
$0$12.5M$25.0M$37.5M$50.0M'10FY2010: $2,122,713'11FY2011: $5,742,260'12FY2012: $909,900'13FY2013: $1,487,536'14FY2014: $922,950'15FY2015: $2,627,100'16FY2016: $1,723,950'17FY2017: $2,436,424'18FY2018: $857,970'19FY2019: $194,363'20FY2020: $24,280,127FY2020: $24,280,127'21FY2021: $2,090,289FY2021: $2,090,289'22FY2022: $9,132,191FY2022: $9,132,191'23FY2023: $33,413,655FY2023: $33,413,655'24FY2024: $1,667,755'25FY2025: $3,010,600FY2025: $3,010,600
AIP Pandemic relief, ARRA Infrastructure law (AIG, ATRM, FCT)
By fiscal yeartower operations are calendar years
FYGrantsAwardedAIPOther programs Tower ops$ / opUS $ / op Share of US
2010 2 $2,122,713 $2,122,713 — 127,623 $16.63 $51.72 0.06%
2011 4 $5,742,260 $5,742,260 — 120,422 $47.68 $55.49 0.17%
2012 1 $909,900 $909,900 — 132,721 $6.86 $53.60 0.03%
2013 2 $1,487,536 $1,487,536 — 120,947 $12.30 $50.51 0.05%
2014 2 $922,950 $922,950 — 114,258 $8.08 $57.58 0.03%
2015 2 $2,627,100 $2,627,100 — 109,069 $24.09 $52.92 0.08%
2016 2 $1,723,950 $1,723,950 — 104,431 $16.51 $52.74 0.05%
2017 2 $2,436,424 $2,436,424 — 97,569 $24.97 $55.49 0.07%
2018 2 $857,970 $857,970 — 71,767 $11.95 $60.64 0.02%
2019 1 $194,363 $194,363 — 77,960 $2.49 $58.29 0.01%
2020 2 $24,280,127 $21,898,212 $2,381,915 54,497 $445.53 $102.15 0.50%
2021 4 $2,090,289 $480,868 $1,609,421 67,028 $31.19 $193.37 0.02%
2022 4 $9,132,191 $6,871,034 $2,261,157 60,775 $150.26 $136.54 0.12%
2023 4 $33,413,655 $30,590,276 $2,823,379 55,305 $604.17 $129.46 0.47%
2024 4 $1,667,755 $1,667,755 — 55,872 $29.85 $114.61 0.02%
2025 2 $3,010,600 $1,684,970 $1,325,630 — — — 0.03%

Other programs: pandemic relief (CARES, CRRSA, ARPA), the infrastructure law (AIG, ATRM, FCT) and ARRA. US $ / op is that fiscal year's awards to towered fields divided by those fields' operations, so it compares like with like; Share of US is this field's awards against every award in the FAA's report for the year. A year without counts has no tower figures.

Weighted comparison (CircumFlight's own estimate)

An airline operation and a light-aircraft operation are not the same use of an airport, so this view weights itinerant operations before dividing: air carrier 32, air taxi and military 4, general aviation 1, roughly in proportion to fuel burned, and so to the fuel and ticket taxes that fund the Airport and Airway Trust Fund. The weights are CircumFlight's, not the FAA's; local (pattern) operations are left out. The US column uses the same weights over every towered field with an award that year.

FYAir carrierAir taxi + mil.General aviationUnits$ / unitUS $ / unit
2010 391 98,218 28,659 434,043 $4.89 $4.92
2011 852 89,620 29,742 415,486 $13.82 $5.15
2012 752 96,110 35,372 443,876 $2.05 $5.09
2013 793 88,182 31,746 409,850 $3.63 $4.56
2014 824 80,660 32,580 381,588 $2.42 $5.04
2015 1,098 73,154 34,474 362,226 $7.25 $4.33
2016 1,661 63,340 39,280 345,792 $4.99 $4.31
2017 1,687 53,961 41,635 311,463 $7.82 $4.47
2018 1,761 43,355 26,476 256,248 $3.35 $4.76
2019 2,172 47,750 27,527 288,031 $0.67 $4.50
2020 872 31,673 21,414 176,010 $137.95 $9.32
2021 4,108 37,696 24,826 307,066 $6.81 $18.37
2022 4,048 32,468 23,807 283,215 $32.24 $11.81
2023 3,722 29,432 21,386 258,218 $129.40 $10.65
2024 3,832 33,157 18,647 273,899 $6.09 $9.06
All 28,573 898,776 437,571 4,947,011 $18.11 —
By categorywhat the money was for
CategoryGrantsAwardedShare
Aprons 5 $37,039,676 40%
Taxiways 5 $27,119,688 29%
Safety and security 6 $6,991,397 7.5%
Runways 3 $5,612,815 6.1%
Planning and environmental 7 $3,931,093 4.2%
Terminals 5 $3,839,790 4.1%
Pandemic relief 4 $3,817,149 4.1%
Lighting, signs and navaids 2 $2,594,870 2.8%
Buildings, roads and utilities 3 $1,673,305 1.8%

Categories are read from the FAA's project wording by CircumFlight's rules (noise mitigation first, then the pandemic programs, terminals, runways, taxiways, aprons, lighting and navaids, safety and security, snow removal and equipment, land, planning, buildings and roads). A grant that lists several projects is counted under its largest line item here and shown under it below; a line item with several projects takes the first one named.

Awardsnewest first · click a heading to sort · Sponsor: Town of Nantucket, MA
FY Grant Category Amount Work
2025 3-25-0033-090-2025
2025-08-12
Runways $1,325,630 Rehabilitate Runway
2025 3-25-0033-091-2025
2025-08-12
Lighting, signs and navaids $1,684,970 Install Apron Lighting
2024 3-25-0033-086-2024
2024-08-14
Taxiways $256,140 Shift Taxiway
2024 3-25-0033-087-2024
2024-08-14
Buildings, roads and utilities $141,955 Construct Airport Drainage/Erosion Control
2024 3-25-0033-088-2024
2024-08-14
Runways $69,660 Rehabilitate Runway
2024 3-25-0033-089-2024
2024-09-09
Planning and environmental $1,200,000 Airfield Environmental Mitigation
2023 3-25-0033-082-2023
2023-08-10
Aprons $2,823,379 Expand Apron
2023 3-25-0033-083-2023
2023-08-10
Taxiways $133,381 Shift or Reconfigure Existing Taxiway
2023 3-25-0033-084-2023
2023-08-18
Safety and security $869,050 Acquire Aircraft Rescue & Fire Fighting Vehicle
2023 3-25-0033-085-2023
2023-09-08
Aprons $29,587,845 Expand Apron
2022 3-25-0033-078-2022
2021-11-15
Pandemic relief $2,145,648 General ARPA
2022 3-25-0033-079-2022
2022-01-05
Pandemic relief $115,509 Large Concessions
2022 3-25-0033-080-2022
2022-09-02
Planning and environmental $745,560 Update Airport Master Plan or Study
2022 3-25-0033-081-2022
2022-09-02
Taxiways $6,125,474 Shift or Reconfigure Existing Taxiway
2021 3-25-0033-074-2021
2021-07-13
Planning and environmental $216,600
$195K AIP
Conduct or Update Miscellaneous Study
2021 3-25-0033-075-2021
2021-04-06
Pandemic relief $1,527,115 CRRSA Act Funds
2021 3-25-0033-076-2021
2021-05-09
Pandemic relief $28,877 CRRSA Act Concessions
2021 3-25-0033-077-2021
2021-07-22
Planning and environmental $317,697
$286K AIP
Conduct Airport Related Environmental Assessment/Plan/Study
2020 seq. 71 Safety and security $4,281,434
$3.9M AIP
Security Enhancements
2020 seq. 72 Taxiways $19,998,693
$18.0M AIP
Reconstruct Taxiway
2019 3-25-0033-070-2019 Safety and security $194,363 Security Enhancements
2018 seq. 068 Buildings, roads and utilities $382,500 Install Emergency Generator
2018 seq. 069 Planning and environmental $475,470 Conduct Environmental Study - For AMPU Alternatives
2017 seq. 66 Planning and environmental $94,230 Update Airport Master Plan Study
2017 seq. 67 Aprons $2,342,194 Install Perimeter Fencing not Required by 49 CFR 1542, Reconstruct Apron
2016 seq. 64 Buildings, roads and utilities $1,148,850 Improve Airport Miscellaneous Improvements
2016 seq. 65 Terminals $575,100 Modify Terminal Building, Security Enhancements
2015 seq. 62 Aprons $1,903,500 Rehabilitate Apron
2015 seq. 63 Safety and security $723,600 Acquire Aircraft Rescue & Fire Fighting Vehicle, Acquire Snow Removal Equipment
2014 seq. 59 Safety and security $573,750 Acquire Aircraft Rescue & Fire Fighting Vehicle
2014 seq. 60 Safety and security $349,200 Install Perimeter Fencing, Security Enhancements [Computers, monitors, server, blast blankets, customized video/training software, SIDA access & access control]
2013 seq. 57 Planning and environmental $881,536 Update Airport Master Plan Study
2013 seq. 58 Taxiways $606,000 Install Airfield Guidance Signs, Rehabilitate Taxiway "D"
2012 seq. 56 Lighting, signs and navaids $909,900 Install Airfield Guidance Signs, Install Miscellaneous NAVAIDS, Rehabilitate Runway Lighting [HIRLS] - 06/24
2011 seq. 52 Terminals $851,986 Construct Terminal Building [Phase VII]
2011 seq. 53 Terminals $289,991 Construct Terminal Building [Phase VII - B]
2011 seq. 54 Aprons $382,758 Conduct Environmental Study [South Apron]
2011 seq. 55 Runways $4,217,525 Extend Runway [Phase I] - 15/33, Rehabilitate Runway [1500'] - 06/24
2010 seq. 50 Terminals $1,061,356 Construct Terminal Building [Phase VI (Part A)]
2010 seq. 51 Terminals $1,061,357 Construct Terminal Building [Phase VI (Part B)]

From the FAA's Airport Improvement Program grant history reports, FY2010–FY2025 (federal fiscal years, October to September), as the FAA published them. Every program in those reports is counted: from FY2020 they include CARES, CRRSA and ARPA relief, and from FY2021 the infrastructure law's AIG, terminal (ATRM) and contract tower (FCT) grants, so a total here is not AIP alone; the AIP share is shown separately. Tower operations are the FAA's ATADS counts for towered fields, calendar years 2010 to 2024; a field without a tower has no counts, and a year's dollars per operation divide a fiscal year's awards by the same-numbered calendar year's count. Grants to state block programs, system plans and proposed airports carry no airport identifier and are not shown on airport pages. Ranks count airports with at least one award in these years. Figures are as published and may be revised by the FAA; this is not FAA analysis. Sources: FAA AIP grant histories, FAA ATADS airport operations. What a sponsor agrees to in accepting a grant: FAA grant assurances.

Nearby airports

AirportNameDistanceBearingConditionsWind
1B2 KATAMA AIRPARK 21.9 nm 287° W —
KCQX CHATHAM MUNI 26.3 nm 007° N VFR Calm
KMVY MARTHA'S VINEYARD 26.3 nm 289° W VFR 260° 3 kt
KHYA CAPE COD GATEWAY 26.9 nm 338° N VFR Calm
5B6 FALMOUTH AIRPARK 29.4 nm 313° NW —
2B1 CAPE COD 30.2 nm 329° NW —
Private-use fields nearby (6)
MA55 MUSKEGET ISLAND 11.8 nm 295° NW —
MA44 TRADE WIND 25.6 nm 296° NW —
MA25 LONG POND 28.7 nm 000° N —
MA12 MIDDLE POND 29.7 nm 327° NW —
KFMH CAPE COD COAST GUARD AIR STATION 32.0 nm 320° NW VFR 300° 5 kt
15MA CANAPITSIT 39.6 nm 285° W —

Distances are great-circle from the airport reference point; bearings and winds are true. Conditions are each field's own METAR from the last two hours; a dash means it has none.